Turnkey · Turnkey stack

Mobility and site power in one project

Device fleets and S Series or site energy specified as two workstreams in one proposal.

Some sites fail because the device is wrong. Some fail because the circuit is wrong. When both problems sit in the same operation, separate proposals can leave the interface and the schedule between them unowned—and that usually surfaces in the week of go-live.

We can write both workstreams into one proposal without pretending they are the same engineering job. You get a visible mobility scope, a visible power scope, and separate acceptance for each.

When this page applies

A weak-grid warehouse may still need a personal digital assistant (PDA) fleet. A field crew may need rugged devices and a known AC/DC kit. A shop may need point-of-sale (POS) terminals and outage coverage. In each case one proposal coordinates the work without collapsing the technical boundaries between them.

Two workstreams

Mobility combines rugged handheld or payment terminal hardware with mobile device management, terminal management where payments require it, and insights. Power uses the portable S Series for model-level backup or site storage and renewables for load-level engineering.

Acceptance is separate. The device go-live does not wait on interconnection unless you explicitly want it to.

Related: Field turnkey · Warehouse turnkey · Energy solutions

Bring a defined requirement into review.

Share the environment, location, approximate quantity or capacity, and timeframe. We’ll identify the missing inputs and confirm the next useful commercial step. Pricing is not instant or binding.

Requirement still taking shape? Book a Meeting instead — no finished specification needed.

Request a Quote